Flagstone mortar mix is made by mixing sand hydrated lime and portland cement in precise quantities.
Mortar calculator for flagstone patio.
This will be based on how the product is set wet or dry and the intended traffic pedestrian or vehicular divide the square footage needed by the approximate coverage per ton to determine total tonnage needed.
When using non premixed mortar like type n m or s masonry cement approximately 18 shovels or 200 lbs of fine masonry sand will be needed.
The hydrated lime is often left out but it adds long term strength and durability flagstone mortar mix checklist.
Here is an example.
The calculator will indicate the number of 80 lb.
With over thirty acres of landscape material including flagstone soils mulches decorative gravel and river rock pavers boulders and building stone you are sure to find.
3 5 per square foot laying flagstone patios in stone dust or sand as opposed to mortar or concrete is known as dry set or sand set.
Determine the thickness needed for your flagstone product.
This totals 11 cubic yards.
Actual costs will depend on job size conditions and options.
All yields are approximate and do not allow for uneven application thickness waste etc enter number of square feet desired.
3 buckets of 5 gallon size of fine sand 6 38 gallons of portland cement and 1 2 gallons of hydrated lime.
Hydrated lime is a mythical mortar component forgotten by many.
Use this flagstone calculator to calculate the tons of flagstone needed to do your patio sidewalk driveway or floor.
Lime has been around for thousands of years.
Feet of porch surface so enter in the slab calculator 4 thickness by 3 width by 3 length.
A good outdoor hydrated lime mortar recipe is.
Mix only as much mortar as you will use in 1 or 2 hours and do not add more water if mixture starts to get thick.
For a basic project in zip code 47474 with 120 square feet the cost to install a flagstone patio starts at 17 86 22 90 per square foot.
Dry construction is much easier for do it yourselfers because you can build directly on the ground while mortared stone requires a concrete slab foundation to prevent cracking in the mortar.
Mix 1 5 parts portland cement 3 parts sand 0 5 part hydrated lime.
Bags of quikrete veneer stone mortar you will need to construct your wall including the scratch coat bond coat and jointing mortar application.
Bags of mortar color.
We recommend rounding up on all approximations to ensure you have enough material.
By rusty march 29 2010 comments off on flagstone calculator free flagstone calculator to calculate flagstone tonnage.
Use the slab calculator to figure the concrete needed for the porch surface.