Metal r panels must be installed reversed with ridges facing the.
Nichiha siding installation instructions.
Nichiha spacer may be used in conjunction with panel attachment hardware if necessary to ensure an even substrate.
Nichiha awp cladding may be installed on.
Nichiha spacer may be used in conjunction with panel attachment hardware if necessary to ensure an even substrate.
Walls that are out of plumb for example can negatively impact the installation quality of awp.
Next liberally apply polyurethane construction adhesive to both surfaces of the channel and place sill chiseled piece irmly onto the channel ensuring solid contact with the back wall surface of the channel and a seating depth of 7 8.
Do not use stain or oil or alkyd based paints on nichiha products.
Secure the l angle channel with 8 x 1 1 4 lath lathead screws spaced every 16.
Walls that are out of plumb for example can negatively impact the installation quality of awp.
Prior to nichiha installation closely inspect exterior wall substrate and correct any problems.
Painted within 12 months of installation.
Begin the installation by placing the first course of shingles flush with the bottom edge of the starter course and securing with the appropriate fastener.
Metal buildings must be new construction.
Do not apply paint when siding is wet.
Find 3 part specifications installation manuals product certifications safet data sheets and more technical documentation in our convenient resource center.
Nichiha does not warrant or accept liability for.
Apply low adhesive tape along the panel edges at double flange joints to protect panel finishes from sealant and for a smoother look when the sealant is applied and tape removed.
Follow the manufacturer s instructions for use.
Apply astm c920 class 35 min compliant sealant into the expansion joint starting at the bottom and pushing sealant into the gap.
Prior to nichiha installation closely inspect exterior wall substrate and correct any problems.
Nichiha installation guide for ten foot panels vertical 6 pre engineered metal buildings pemb secure 7 16 osb or plywood to structure with the guidance of a structural engineer.
High quality exterior grade 100 acrylic latex paints are recommended.